Skip to content
Get Matched
Guide

How long does flooring installation take?

A short, plain-English answer from the Flooring Pros Nashville directory.

How long does flooring installation take?
The answer

In short

A single room of click-together flooring can be done in a day, while a whole house of nailed hardwood can take a week or more. The time depends on the material, the size, the layout and how much prep the subfloor needs.

Plan for steps before and after the install: moving furniture, removing the old floor, letting the new material acclimate in the house, then trim, transitions and cleanup. Site-finished hardwood adds days for sanding, stain and coats of finish between drying times.

Tile adds curing time: setting, then grouting after the mortar cures, then sealing. Epoxy and concrete coatings need time to cure before foot traffic and before cars.

Ask each company for a day-by-day schedule and for when each room is usable again, so you can plan around the work.

Next step

Find a company

Compare the Top 10 for flooring installation in Nashville, or choose your city.

Top 10 Flooring InstallationAll categories

Get matched

Tell us what you need

Send your city and the floor you have in mind. A real person will reply with the right Top 10 list and a clear next step.

  • Your city and the floor: new hardwood, tile or vinyl, a refinish, a repair, a garage coating or a quote to compare
  • Anything you know about the floors: the rooms, the size, what is there now, your budget and what you have in mind
  • Every company in our lists is a Local Service Provider with Google ratings you can check

Get matched with a flooring company

We only use your details to answer your message and point you to the right companies.